Induction hob installation: do you need an electrician?
Yes, if the hob needs a new or upgraded power point. The Energy Market Authority (EMA) says electrical work at home should be carried out or supervised by a Licensed Electrical Worker (LEW). That includes installing, repairing or modifying wiring, and adding, extending or replacing power points. EMA says electrical work in an HDB flat needs a Licensed Electrician, the class of LEW approved for loads of up to 45kVA. Every LEW carries a licence card with a photo, name and licence number, so check it before work starts.
Whether you need that work depends on the hob, so start with the hob itself. Check its rating plate and the manual for the plug or connection it needs. A plug-in model may only need a socket of the right rating. A built-in hob usually needs its own induction hob power point, which means new wiring by an LEW.
Note the model and its rating before you contact anyone, so the LEW can confirm what the point should be. If the hob is going into new kitchen carpentry, share the cabinet layout too, so the point can be planned before the cabinets are fitted.
For other jobs around the kitchen, the guide to work that needs an LEW sets out which tasks count as regulated electrical work.
HDB rules for cooker units
For an induction cooker, HDB sets conditions in its renovation guidelines for electrical works. They cover installing an electric oven or cooker unit and give an induction plate cooker as an example. What applies depends on your flat's main switch rating:
- 30amps main switch: an individual electric oven or cooker unit should not exceed 3kW. There is no restriction on the number of appliances, subject to the main switch rating.
- 40amps main switch, or a flat upgraded under the Main Upgrading Programme (MUP) or Home Improvement Programme (HIP): there is no restriction on the number of appliances, subject to the main switch rating and the rating of appliances not exceeding a 15amps power point.
HDB does not allow appliances with an electrical rating above 15amps, and a 20amps isolator is only allowed for air-conditioner installation. For testing of new wiring, SP Services Form CS/5H endorsed by HDB has to be submitted.
If you do not know your main switch rating, ask your Licensed Electrician to confirm it before you buy the hob. The guide to HDB electrical renovation rules covers HDB's other electrical rules for renovation.
Plug, socket and rating
The Consumer Product Safety Office (CPSO) says the 13A 3-pin fused plug (Type G) suits most appliances in Singapore. It is especially important for metal-bodied appliances, which should be earthed through the plug's earthing pin. The 15A 3 round-pin plug (Type M) is used by energy-intensive appliances such as air-conditioners, and 15A socket outlets should only be installed by qualified electrical workers. CPSO adds that the 3-pin plug should carry a SAFETY Mark, and that Schuko 10A/16A plugs are not suitable for use in Singapore.
If the hob's plug does not fit your socket, do not force it. Ask an LEW what the hob needs instead. The guide to socket ratings explains how 13A, 15A and 20A points differ.
Testing and safety
EMA's electrical safety page says the LEW inspects and certifies that the installation is safe before supply is turned on. New wiring, rewiring and extensions also have to be tested by an authorised officer from SP Services Ltd before supply can be turned on. EMA also asks you to keep electricity and water apart and not to touch switches or sockets with wet hands, which matters in a kitchen.
How the cable reaches the hob matters too. HDB does not allow wiring to be embedded in reinforced concrete slabs, beams, columns, walls or wall plaster. In an HDB flat, new wiring runs in surface trunking, above a false ceiling or behind carpentry, so ask the LEW how the cable to the hob will be routed.
What a new point costs
FROM THE HOMEZYPRO DIRECTORY
Published power point installation rates
For the most common unit (per job), the lowest published power point installation rates from 7 companies run from S$28 to S$90 per job (middle rate S$75), for one 13A socket point. The middle figure is a real published rate, not an average. Each figure is one company's own advertised rate with its conditions, not a quote.
See 9 published power point installation rates and sources
| Company | Service as listed | Rate | Source |
|---|---|---|---|
| Skyteam Electrical Pte Ltd | Additional wall sockets (3-pin, 13A) | S$28 per job | skyteamelectrical.sg |
| AVV Engineering Pte Ltd | Replace Power Socket | From S$30 per job | avvelectrical.com |
| Electrician24 Singapore | Power Point Installation | S$60 to S$120 per job | electrician24.sg |
| Yong Jin Solutions Engineering Pte Ltd | Power socket installation | From S$60 to S$130+ per point | yongjinelectrical.sg |
| Mr Electrician Pte Ltd | Single Power Point | S$65 | mrelectrician.sg |
| Saikon Contractors | Single 13A socket | S$75 per job | saikon.com.sg |
| Lito Electrical Service | Additional power socket point | From S$80 per job | litoelectrical.com |
| 81 Electrical | Double power point (13A x2) | From S$90 per job | 81electrical.com |
| Spower Electrician Services | Supply and install single or double 13A power socket (non-conceal) | From S$90 per job | spower.com.sg |
In the directory, 9 companies publish a power point installation line, and 7 of them price it per job. Their lowest published rates run from S$28 to S$90 per job, and the middle company's published rate is S$75 per job. Of the other two, one prints "From S$60 to S$130+ per point" and one lists S$65, printed without a unit. These are each company's own rates as printed, not quotes.
The scope as printed is one 13A socket point, and the lines vary: some cover a replacement socket, some an additional socket and some a double point. A hob point may differ from a standard socket point, so ask each company what its price covers for your hob and whether it includes the trunking.
For more on what these jobs involve, see power point installation cost and socket installation.
NEXT STEP
See electrical companies in the directory with their published prices, the areas they say they cover and their sources.
Compare electriciansQuestions
Can I plug an induction hob into a normal socket?
Yes, if the hob's plug and rating suit that socket. Check the rating plate and the manual for the plug or connection the hob needs. A built-in hob usually needs its own point, added by a Licensed Electrical Worker (LEW). If the plug does not fit the socket, do not force it, and never run a hob from a power strip.
Do I need an HDB permit for an induction hob?
You need to follow HDB's conditions for cooker units, which its electrical works guidelines list with an induction plate cooker as an example. In flats with a 30amps main switch, an individual cooker unit should not exceed 3kW. New wiring needs SP Services Form CS/5H, endorsed by HDB, to be submitted for testing, so ask your Licensed Electrician about the form.
Can I replace a gas stove with an induction hob?
Yes, but the gas point must be capped by the gas company or a licensed gas worker. The induction side is a separate job: check the hob's rating plate and plug, and have a Licensed Electrical Worker (LEW) add any new or upgraded power point the hob needs.
Does an induction hob need special cookware?
Yes, the cookware must be magnetic. Hold a magnet to the base of each pot or pan: if it sticks, the pan will work on an induction hob. If it does not stick, the hob will not heat it. Test the pans you already own before you buy, so you know what you may need to replace.
Can the hob share a point with the oven?
That is a question for a Licensed Electrical Worker (LEW), who can check both rating plates and manuals against the point. Never run both from a power strip. In flats with a 30amps main switch, HDB says an individual electric oven or cooker unit should not exceed 3kW, and the number of appliances is subject to the main switch rating.
What should I check before buying an induction hob?
Check the hob's rating plate and plug against the power point you have, and find out your flat's main switch rating (the socket ratings guide above explains the plug types). In flats with a 30amps main switch, HDB says an individual cooker unit should not exceed 3kW. If you are not sure of your rating, ask a Licensed Electrician.
Prices come only from the sourced company rates in the HomezyPro directory, shown with each company and its source.
Practical guidance for planning a home job in Singapore. Company prices come from the HomezyPro directory, each linked to its source; rules and safety points link to the agency or manufacturer that sets them. This is not a site inspection, a quote or professional advice for your home.
How HomezyPro worksYOUR NEXT STEP
Find the right team for your home.
Compare services, published prices and sourced reviews. Contact the company directly to confirm your job and availability.
Explore electrician companies